SHOALWATER BAY TRAINING AREA ELECTRICAL REMEDIATION WORKS PROJECT
ENHANCING ELECTRICAL AND COMMUNICATION NETWORKS FOR LONG-TERM EFFICIENCY
​
SHOALWATER BAY, QLD
DEPARTMENT OF DEFENCE
DURATEC AUSTRALIA
$2M PLUS | JAN 2025 - JUNE 2025
​
Allstar Infrastructure supported Duratec Australia and completed the Electrical Remediation Works Project at Shoalwater Bay, delivering a high-performance electrical and communication system. This large-scale infrastructure upgrade ensures a more efficient and resilient power supply across the training area.
SCOPE OF WORK:
​
Electrical and Communication Infrastructure Upgrades
-
Installation of over 3km of new electrical conduits across camps and roadways.
-
Upgrades to Low Voltage (LV) and High Voltage (HV) systems to enhance power distribution.
-
Installation of communication pits and conduits for improved connectivity.
​
Structural and Civil Works
-
Excavation and underground installations to protect infrastructure.
-
Road crossings and trenching to accommodate new conduits.

CHALLENGES AND ACHIEVEMENTS:
​
-
Large-scale excavation with existing infrastructure risks
-
Conducted detailed site assessments to identify safe digging zones.
-
-
Complex structural requirements
-
Used advanced planning and phased construction to minimise disruption.
-
-
Weather-related project delays
-
Applied flexible scheduling and contingency planning to maintain progress.
-
KEY ACHIEVEMENTS:
​
-
Successfully installed a modern power and communication network to support long-term needs.
-
Improved electrical system reliability with upgraded conduits and HV/LV infrastructure.
-
Executed complex excavation and roadworks with minimal disruption.
-
Future-proofed Shoalwater Bay’s electrical infrastructure for enhanced efficiency and safety.
​
Allstar Infrastructure’s work ensures a robust, future-ready electrical network, supporting the ongoing operations of Shoalwater Bay.