LUGGAGE POINT SEWERAGE
PINKENBA, QLD | FULTON HOGAN (URBAN UTILITIES)
$185M ($2M) | JUN 2020 - MAR 2021
​
Fulton Hogan engaged Allstar to provide diverse civil, structural and mechanical works at the Luggage Point
Sewage Treatment Plant as part of Urban Utilities Northern Treatment Plant Capital Works Program. The program is delivering brownfield treatment plant renewals and upgrades at six major urban and coastal sewage treatment plants and is being delivered through the Program Management Approach (PMA) operating model that will transition the business from an asset- centric business to a customer centric organisation.
OUR SCOPE:
​
-
Utility mapping: service location, non- destructive excavation, survey
-
Condition assessment
-
Diverse electrical installations
-
Construction of in situ substation structures, retaining walls and concrete slabs
-
DN50/DN100 PVC electrical conduits, PVC drainage pipes, DN150 316SS outlet pipes and concrete inlet pit excavation works
-
Bulk earthworks and deep excavations
​
​
HIGHLIGHTS/CHALLENGES:
​
-
Working within brownfield areas with unknown below ground services due to zero as-constructed records
-
Working within and around High Voltage assets
-
Excavating around and near above ground infrastructure
-
Safely delivered the works in parallel with other contractors (SIMOPS)
-
ZERO asset strikes utilising Air Vacuum Excavation units